Skip to content
case study · groundscare & sport

Premier League Club – Grounds Maintenance Fleet

All case studies
Buckingham Leasing 2024-09-10

Industry: Groundscare  ·  Project: Twenty four cylinder mowers  ·  Facility: approximately £350,000 over 60 months, finance lease

Overview

A Premier League club needed to renew the mowing equipment used across its stadium pitch and training ground surfaces. The package covered twenty four pedestrian and ride-on cylinder mowers at a cost of around £350,000.

Football pitch being maintained

Challenge

Pitch standards at this level are non negotiable, and the club wanted every surface cut to the same specification. It also wanted the equipment treated as an operating cost rather than an owned asset, keeping the balance sheet clear for other stadium projects.

Solution

We arranged a finance lease over 60 months. The club uses the equipment for the full term with the cost spread evenly, and the arrangement keeps the machines off the club's asset register while it plans wider infrastructure work.

Results

  • Consistent cut across stadium and training ground surfaces
  • Cost spread evenly across a five year term
  • Equipment held on lease rather than purchased outright
  • Capital left available for other stadium projects

More case studies

All case studies

Discuss a project

Tell us what you need to fund and we'll come back within one business day with a route.

Get in touch